With NGCP, outages on Akelco line end

POWER transmission system provider NGCP has formally assumed ownership, operation, and maintenance of the Caticlan-Unidos 69kV Line—an asset long beset by operational issues—following a directive from the Energy Regulatory Commission (ERC). The transition allows NGCP to immediately implement corrective measures to improve the condition of the line and enhance power reliability in the province.