Author Archives: LM Staff

DOE vows better Visayas power before Marcos exits

MANILA, Philippines — The Department of Energy (DOE) is confident it can resolve the Visayas’...

Garin sees energy sector attaining more infra gains

ENERGY Secretary Sharon Garin is optimistic about achieving greater infrastructure accomplishments in the energy sector,...

NGCP builds Cebu transmission projects as Visayas solar capacity grows

CEBU CITY (PIA) — The National Grid Corporation of the Philippines (NGCP) is building two...

Central Luzon to gain 82MW solar capacity through new renewable energy projects

CITY OF SAN FERNANDO, Pampanga (PIA) — Central Luzon is set to gain an additional...

Citicore Renewable Energy Corporation Secures ₱4.05 Billion LANDBANK Loan for 82 MWp Embedded Solar Projects in the Philippines

Citicore Renewable Energy Corporation (CREC) has secured a ₱4.05 billion project finance loan facility from...

Berde Renewables secures 200-MW solar, 500-MWh battery supply deal

Berde Renewables has secured a three-year agreement to procure 200 megawatts (MW) of solar inverters...

EDC unit to upgrade 40-year-old Negros geothermal plant

Green Core Geothermal Inc. plans to expand the capacity of its Palinpinon 1 Geothermal Power...

G-Drive Solutions enters solar market with new renewables unit

G-Drive Solutions, Inc. has entered the renewable energy sector through the launch of G-Drive Renewables,...

McDonald’s taps COREnergy to power Visayas stores with RE

McDonald’s Philippines has tapped COREnergy, the retail electricity supply unit of Vivant Energy, to participate...

ERC denies fast-track approval for Meralco’s 200-MW PSA with San Miguel unit

The Energy Regulatory Commission (ERC) has denied the request of Manila Electric Company (Meralco) and...