Public hearings set for Prime Infra’s 600-MW Wawa pumped-storage hydropower project

The Department of Environment and Natural Resources’ Environmental Management Bureau (DENR-EMB) has scheduled public hearings next month for the proposed 600-megawatt Wawa Pumped-Storage Hydropower Project in Rizal, including additional components tied to its planned transmission connection to the National Grid Corporation of the Philippines (NGCP).

Artelia Philippines accelerates PH’s energy transition with integrated solutions for sustainable infrastructure

Artelia Philippines, specializing in engineering and project management consultancy, is strategically reorienting its operations to align with the Department of Energy’s (DOE) Philippine Energy Plan and national decarbonization targets. The company is strengthening its position as a primary technical partner for companies navigating the complex shift to sustainable energy.

Visayan Electric urges vigilance as Visayas grid still faces supply risks

Cebu City — Visayan Electric has cautioned consumers to remain alert for possible power service interruptions despite the restoration of transmission lines that provide surplus energy from Luzon to the Visayas Grid, stressing that grid stability still depends on the delicate balance of available reserves, electricity demand, and power supply.