Author Archives: LM Staff

ERC: Rules absent after failure to approve NGCP’s 4th regulatory reset

The Energy Regulatory Commission (ERC) chief admitted before congressmen on Monday, Dec. 23 the lack...

NEA chief absolves NGCP; sets record straight on lengthy Siargao power outage

National Electrification Administration (NEA) Administrator Antonio Almeda has clarified that he never meant to blame...

DoE sees about 300 participants in Renewable Energy Market

ALMOST 300 entities are expected to participate in the Philippines’ Renewable Energy Market (REM), which...

ERC to release NGCP rate reset by January

MANILA – The Energy Regulatory Commission (ERC) expects to complete the rate reset for the...

Rate cuts may reduce energy dev’t costs and boost capacity

A SERIES of rate cuts totaling 75 basis points (bps) by the Bangko Sentral ng...

New solar, wind farms fuel ACEN’s optimism for strong 2024 results

As the year nears its close, Ayala-led ACEN Corporation anticipates a strong performance in 2024,...

Sale of Casecnan dam to raise ₱50B for govt

THE national government is keen on privatizing the Casecnan dam to shore up revenues for...

San Jose activates solar plant in Nueva Ecija

YUCHENGCO-LED San Jose Green Energy Corp. has switched on a 19.6-megawatt-peak (MWp) solar power plant...

AdventEnergy to sign supply contracts worth P1.8b next year

AdventEnergy Inc., the retail electricity supply (RES) arm of Aboitiz Power Corp., said it expects...

SN Aboitiz taps GEDI to build battery storage expansion in Isabela

SN ABOITIZ POWER Group has tapped a Chinese firm to build the second phase of...